Main INDEX
Monthly INDEX
PREV
NEXT
User name E.Chudakov
Log entry time 00:00:23 on August22,2003
Entry number 112504
keyword=Swing shift summary
16:00-20:00 no beam (Hall C current calibration and accelerator problems)
15:45-16:30 control access (Sirish inserted the Compton electron detector manually)
20:30 the aspect ratio is 180x170um
20:30-20:40 DAQ reloading
20:40 Start data taking (10um, mult.12C, 2.922 GeV/c)
20:40 Compton tune was optimized
20:55 Raster tune: 3.5x3.5mm**2 at 15.2Ax35.A
21:40-22:03 Setting to 2.813 GeV/c
22:22-22:46 Setting to 2.704 GeV/c
23:05 - Start Moller tunning
23:30 - MCC told us that the Compton lock will not work untill morning
23:45 - Start Moller measurement