• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name J. Singh

    Log entry time 04:43:26 on August22,2003

    Entry number 112556

    keyword=beam position during 1.991 acceptance

    beam position during acceptance @ 1.991 wasn't great. MCC had problems with the pos feedback lock. they are working on it. it did seem to get better as the data taking progressed. fig 1 is the strip chart from that period. black is our BCM. purple is the hall C BCM. the positon scale for all four postion is -0.2 to 0,2


    FIGURE 1