Main INDEX
Monthly INDEX
PREV
NEXT
User name jpchen
Log entry time 17:29:12 on August22,2003
Entry number 112679
keyword=12C foils replaced.
We (Vince and I) took a controlled access. We replaced the four short 12C foils, did not change the middle long one. The new configuration
now is: long, short, long, short, long.
We checked ice and no obvious ice forming looking from upstream window.
Vince is still working on the EPR system in the hall.