• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen

    Log entry time 17:29:12 on August22,2003

    Entry number 112679

    keyword=12C foils replaced.

    We (Vince and I) took a controlled access. We replaced the four short 12C foils, did not change the middle long one. The new configuration
    now is: long, short, long, short, long.
    We checked ice and no obvious ice forming looking from upstream window.

    Vince is still working on the EPR system in the hall.