    swing shift
    shift leader:Jing,Yuan;
    T.O:Vince sul.
    3nd:juan cornejo;
    16:00 we refix dipole of right arm , refilled the septum helium back to 87% level and septum ramp up(until 23:50 we didn't finish ramping);
    17:30 did harpscan ;
    21:30 Eugene run moller measurement(77.8%);
    23:40 we solved all the problems;and continue to septum ramp up;
    23:50 MCC change hallA to beam permit;
    23:57 Harpscan :X:152; Y:167;
    OTR:X:140; Y:190;