    crew: B.Wojtsekhowski, A. Deur , R.Gilman

    Run 4082 - empty reference cell for 5 min at 10 mkA - done
    with 10 mkA on 140 psi N2 the beam trip, MCC suggested
    to drop the current.
    Run 4084 - 5 mkA on 140 psi N2 - 1.5 m events
    bleed from Hall C is 2.28%
    NMR measurement is done
    field at 0 degree
    beam wave plate IN
    Run 2085/4085 - 5 mkA right arm has 3m events
    Run 2086/4086 - 5 mkA 3m
    Run 2087/4087 - 5 mkA 3m
    Run 2088/4088 - 5 mkA 3m
    Run 2089/4089 - 5 mkA 1.2m
    beam wave plate OUT
    Run 2090/4090 - 5 mkA 1.8m
    10 am beam off for "beam study"
    10:17 Hall A on control access
    at 1 pm MCC told that they have problem to open
    vacuum valve in South linac - estimated time 30'
    15:30 MCC told that they are working on vacuum valve.