Main INDEX
Monthly INDEX
PREV
NEXT
User name bogdanw
Log entry time 16:10:10 on August26,2003
Entry number 113608
keyword=shift summary
crew: B.Wojtsekhowski, A. Deur , R.Gilman
Run 4082 - empty reference cell for 5 min at 10 mkA - done
with 10 mkA on 140 psi N2 the beam trip, MCC suggested
to drop the current.
Run 4084 - 5 mkA on 140 psi N2 - 1.5 m events
bleed from Hall C is 2.28%
NMR measurement is done
field at 0 degree
beam wave plate IN
Run 2085/4085 - 5 mkA right arm has 3m events
Run 2086/4086 - 5 mkA 3m
Run 2087/4087 - 5 mkA 3m
Run 2088/4088 - 5 mkA 3m
Run 2089/4089 - 5 mkA 1.2m
beam wave plate OUT
Run 2090/4090 - 5 mkA 1.8m
10 am beam off for "beam study"
10:17 Hall A on control access
at 1 pm MCC told that they have problem to open
vacuum valve in South linac - estimated time 30'
15:30 MCC told that they are working on vacuum valve.