User name E.Chudakov
Log entry time 00:01:15 on August28,2003
Entry number 113849
keyword=Shift summary
Shift workers:
E.Chudakov, J.Yuan, V.Punjabi
16:00 kinematics 11.11 finished run 4114 (0 deg, 1/2wp out)
16:20-17:00 0 deg,, 1/2wp in, runs 4115-4117
17:20 Septum He level dropped and the current was automatically ramped down from 380A to 191A. It started at about 17:00.
17:40 - we asked for control access
17:00 - Mark Stevens and Ed Folts arrived and opened manually the valve. The He level went up.
17:00 - NMR 41.7%
18:20 - beam permit
18:20-19:40 septum current ramping up
19:40 - septum at 377.25, beam spot checked. Start run 4120
20:50 finished 0 deg, 1/2wp in point, runs 4115-4117, 4121-4124
21:00 start 270 deg, 1/2wp in, run 4125
21:50 the beam spot position is unstable - jumping around every several minutes by 0.3-0.5mm, sometimes up to 1mm. MCC told they did not know why.
22:25 finished 270 deg, 1/2wp in, runs 4125-4130
22:27 start 270 deg,, 1/2wp out, run 4131
22:50 the beam position became much more stable (after we complained to MCC)
22
23:50 finished 270 deg, 1/2wp out, runs 4131-4136
23:50 started changing to kin.11.12 Phrs=2.685 GeV