User name Reitz
Log entry time 12:23:03 on December21,2003
Entry number 114875
keyword=EP measurement
tried an EP measurement at 9:00 am,
however there was no counting rate with the EP target.
since an access into the Hall was planned anyhow, we
decided to postpone EP until after the access, to inspect
the EP target from downstairs first.
inspection was inconclusive, interlock switch showed 8 / 40 mV,
it should be 0 mV if target is okay, and !=0 if not, but I
thought the signal for broken should be more than the few mV observed.
will try another EP attempt later, if RC allows