    User name Reitz

    Log entry time 12:23:03 on December21,2003

    Entry number 114875

    keyword=EP measurement

    tried an EP measurement at 9:00 am,
    however there was no counting rate with the EP target.
    since an access into the Hall was planned anyhow, we
    decided to postpone EP until after the access, to inspect
    the EP target from downstairs first.

    inspection was inconclusive, interlock switch showed 8 / 40 mV,
    it should be 0 mV if target is okay, and !=0 if not, but I
    thought the signal for broken should be more than the few mV observed.

    will try another EP attempt later, if RC allows