Main INDEX
Monthly INDEX
PREV
NEXT
User name R. Snyder
Log entry time 16:03:39 on December21,2003
Entry number 114904
keyword=Day Shift Summary
08:30 ep measurement
09:30 RICH detector repair
11:00 Start septum cooldown
14:35 Septum cooldown completed. Vrey long cooldown Set septum current to 180.07 Amps on each side.
14:20 Current is ramped up to desired value, and we are now ready for beam.
14:25 Run with empty target at 5 microamps
14:35 12C (thick) was inserted and RICH data taking started at 5 microamps