Main INDEX
Monthly INDEX
PREV
NEXT
User name jpchen
Log entry time 15:32:41 on December23,2003
Entry number 115048
keyword=Beam shift with right Septum at 250 uA
Right Septum at 250 uA, left is off. With the new installed steel beam pipe, the spot at the dump is shift by a little more than 1 cm, Almost one order of magnitude better than before.
FIGURE 1