Hall A Experiment #: Commission
12/23/03 0800-1600
Shift Leader: J. P. Chen
Shift Workers: R. Snyder
0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.33 | 0.91 | 0.89 | 2.13 |
Beam Available but Not in Use | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 0.58 | 0.00 | 0.00 | 5.58 |
Beam Not Available or Unacceptable | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.08 | 0.09 | 0.11 | 0.28 |
Accelerator Con- figuration Change | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Experiment Ready | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.42 | 1.00 | 1.00 | 2.42 |
Planned Config- uration Change | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 0.58 | 0.00 | 0.00 | 5.58 |
Unplanned Experiment Down | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Hall not ready reasons | |||||||||
Target | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Data Acq | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Other | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSR | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HALL_OFF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Comments: Installation of steel beam pipe completed by 1 pm. Hall locked up at 1:20pm. Beam back at 1:35 pm. Tested fast feedback, still problem. Tested Setptum steering effect, much smaller effect with the new installed steel beam pipe.
Data Entry by: J. P. Chen