    12/23/03 0800-1600
    Experiment #: Commission
    Shift Leader: J. P. Chen
    Shift Workers: R. Snyder

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    0.000.000.000.000.000.330.910.892.13
    Beam Available
    but Not in Use
    1.001.001.001.001.000.580.000.005.58
    Beam Not Available
    or Unacceptable
    0.000.000.000.000.000.080.090.110.28
    Accelerator Con-
    figuration Change
    0.000.000.000.000.000.000.000.000.00
    Experiment
    Ready
    0.000.000.000.000.000.421.001.002.42
    Planned Config-
    uration Change
    1.001.001.001.001.000.580.000.005.58
    Unplanned
    Experiment Down
    0.000.000.000.000.000.000.000.000.00
    Hall not
    ready reasons
    Target0.000.000.000.000.000.000.000.000.00
    Data Acq0.000.000.000.000.000.000.000.000.00
    Other0.000.000.000.000.000.000.000.000.00
    HRSL0.000.000.000.000.000.000.000.000.00
    HRSR0.000.000.000.000.000.000.000.000.00
    HALL_OFF0.000.000.000.000.000.000.000.000.00

    Comments: Installation of steel beam pipe completed by 1 pm. Hall locked up at 1:20pm. Beam back at 1:35 pm. Tested fast feedback, still problem. Tested Setptum steering effect, much smaller effect with the new installed steel beam pipe.

    Data Entry by: J. P. Chen