• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name reitz

    Log entry time 13:09:17 on January10,2004

    Entry number 115448

    keyword=edtm/rich work

    while MCC is working on the leakiage problem,
    we took an access and:
    - removed gassiplex board #3 in the first section
    - moved gassiplex board #1 to #3
    - put a spare board int #1
    (the old #3 was noisy)

    - i checked cabling of the EDTM tag towards the TDCs
    left arm: it goes to slot 9 channel 84 in bottom crate
    right arm: it goes to slot 12 channel 48
    and connected additional lines to scalers