• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name C. C. Chang

    Log entry time 00:02:16 on January17,2004

    Entry number 115898

    keyword=Shift summary

    Run # Start Stop # of Events Comments

    1837 15:59 16:32 109K Beam tuning during run.
    1838 16:36 17:53 3.9K No beam most of the time, junk
    1839 23:23 24:00 0.5M Good run.

    *****************************************************************
    16:10 We will continue to take "data" with waterfall while beam
    is being tuned. Bodo is at MCC.
    16:15 RICH tripped.
    16:35 MCC requested to remove waterfall and put in 12C. They
    will also turn rastor off for next beam tuning.
    17:50 For the past hour or so there was virtually no beam. MCC
    called to let us know they will restore beam to us beginning
    with 8 uA.
    19:15 Has been tuning beam with 8 uA for the past hour or so.
    19:40 Ramp down left septum magnet current to zero.
    19:50 MCC called to send us as much beam as they can give us.
    20:00 90 uA of beam in the hall.
    20:30 MCC finished tuning study and concluded that SRI would not
    give info on beam energy spread. Mark went down to the hall
    to cool down left septum.
    22:30 Mark finished cool down left septum magnet; we are in
    the process of ramping the current up.
    22:40 MCC called to get us beam back.
    23:00 80 uA. Call MCC to change to water fall target with
    rastor on.