Main INDEX
Monthly INDEX
PREV
NEXT
User name C. C. Chang
Log entry time 00:02:16 on January17,2004
Entry number 115898
keyword=Shift summary
Run # Start Stop # of Events Comments
1837 15:59 16:32 109K Beam tuning during run.
1838 16:36 17:53 3.9K No beam most of the time, junk
1839 23:23 24:00 0.5M Good run.
*****************************************************************
16:10 We will continue to take "data" with waterfall while beam
is being tuned. Bodo is at MCC.
16:15 RICH tripped.
16:35 MCC requested to remove waterfall and put in 12C. They
will also turn rastor off for next beam tuning.
17:50 For the past hour or so there was virtually no beam. MCC
called to let us know they will restore beam to us beginning
with 8 uA.
19:15 Has been tuning beam with 8 uA for the past hour or so.
19:40 Ramp down left septum magnet current to zero.
19:50 MCC called to send us as much beam as they can give us.
20:00 90 uA of beam in the hall.
20:30 MCC finished tuning study and concluded that SRI would not
give info on beam energy spread. Mark went down to the hall
to cool down left septum.
22:30 Mark finished cool down left septum magnet; we are in
the process of ramping the current up.
22:40 MCC called to get us beam back.
23:00 80 uA. Call MCC to change to water fall target with
rastor on.