Start shift with waterfall target.
Runs 1840-1848 waterfall production
Run 1844 is very short (RICH tripped).
03:20 Move to thick C12 target because
left septum is getting hot (7.05 K).
Beam gone 10 minutes at Hall C request.
Runs 1849-1850 C12 production
Next, Mauro wants to obtain new RICH pedestals.
Prior to pedestal run, increase RICH HV to 2100.
Run 1851 = RICHPED config.
Mauro loads new pedestals for RICH.
Back to C12 production
Run 1852-1866
Noticed that some runs had huge event sizes (see halog, it
was solved by rebooting ROC12 and ROC16). Not sure which
runs affected, probably 1860-1863.
Stopped so that Heidi (tech) can service the L-septum.