• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Olivier

    Log entry time 16:09:38 on January21,2004

    Entry number 116357

    keyword=Day shift summary

    Day shift summary, Wed Jan 21

    Taking #1995 with 100uA
    8:20 Stop #1995 (800k)
    Start #1996
    8:35 Stop #1996 (477k)
    Ask for multiwire harp scan
    9:00 MCC asks to study 100uA beam for a few minutes
    9:15 Ask for controlled access to cool down left septum
    11:50 Left septum magnet is cooled, and is ramping up
    Bob Michaels went in for a few minutes
    12:00 Ask for beam permit
    12:46 Beam back - 100uA, check prescaler, set ps6=15
    12:51 Ask for multiwire harp scan
    13:24 Ask for 5uA to do harp scan in the Hall
    13:30 Realized from ELOG that 1C12 was faulty during multiharp. Redo it.
    13:40 Second harp scan gives 340um in 1C12. This is too large. Call optics on call.
    15:00 Beam will be taken away for at least 3h to investigate optics and other pbs.