    User name Norum

    Log entry time 00:25:39 on January25,2004

    Entry number 116651

    keyword=SWING shift SUMMARY



    During the previous shift at At 13:23 MCC called to say that the machine has dropped to power permit
    either because they lost power in the south linac.
    At 14:00 There was no time estimate for when beam will be back.

    16:00 STARTED shift with no beam.

    20:55 A power break apparently damaged some device in the accelerator control system. Repairs are underway. Current best estimate is that beam will be restored circa midnight. Down time was used to service the left septum.

    00:00 Leave with no beam yet !