Main INDEX
Monthly INDEX
PREV
NEXT
User name A. Deur
Log entry time 02:38:56 on January25,2004
Entry number 116655
keyword=Beam back but not acceptable yet
The beam is back but the horizontal size in 1C12 is 165 um.
MCC said the need to work on each cavity to get back to an acceptable beam dE/E. This will take one or two hours. Meanwhile they can still deliver beam. We decided to run even if the beam seems not acceptable in order to check the detectors.
The first run is 2110