• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name A. Deur

    Log entry time 02:38:56 on January25,2004

    Entry number 116655

    keyword=Beam back but not acceptable yet

    The beam is back but the horizontal size in 1C12 is 165 um.
    MCC said the need to work on each cavity to get back to an acceptable beam dE/E. This will take one or two hours. Meanwhile they can still deliver beam. We decided to run even if the beam seems not acceptable in order to check the detectors.
    The first run is 2110