    4:00 Shift Starts
    In production run 2531            1M 
    16:34 start production run 2532   1M
    17:28 start production run 2533   1M
    18:17 start production run 2534   1M
    18:20 one HV channel 1 ep Arc tripped
    19:04 start production run 2535   1M
    19:30 noticed the Oxygen contamination 
    increased dramatically in the RICH detector.
    19:56-19:57 2536   6K
    19:57 start production of 2537  360K
    20:32 MCC requests ten minutes. Too many trippings of the beam.
    Waiting for beam.
    20:41 start production run 2538  466K
    2538 stopped early because of VDC HV trip 
    21:07 start production run 2539   1M
    22:09 start production run 2540   290K
    run stopped 22:36 beam is off at 22:28
    23:10 start production run 2541  175K
    23:25 MCC called need to replace a control 
    card for one of the magnets stopped run 2541.
    23:50 beam was back for a minute and is off
    
    
    During this shift the beam was stable for a while and 
    then the tripping rate has increased dramatically.