Main INDEX
Monthly INDEX
PREV
NEXT
User name Ole Hansen
Log entry time 16:10:19 on April25,2004
Entry number 119278
keyword=Shift summary
Shift started with beam dump diffuser water flow problem. This was fixed at 10:30am. The rest of the shift was basically very productive, except for 30minutes lost around lunchtime when MCC took the beam away for tests of the injector. Hall C is unhappy with the beam quality and asked us if we could give up our energy lock, but we refused since the energy spread is crucial for the experiment.