    User name LeRose

    Log entry time 16:08:18 on April26,2004

    Entry number 119416

    keyword=Shift Summary

    Start shift with production running on Be
    2793 started in Owl finished 8:23
    2794 started 8:23 finished 8:47
    2795 8:47 - 9:00 ended for beam studies
    9:00 start of beam studies. Scheduled to continue till noon
    9:34 setting left arm to 1 GeV/c for Bogdan's rate test (in case we get any trickles of beam during beam studies)
    9:42 started run 2796
    10:50 MCC says they're having problems with the PSS system. The whole machine has gone down.
    10:55 Making opportunistic controlled access. AES to repair some video problems and Bogdan wants to adjust VDC gas flow.
    11:48 beam studies extended until 13:00
    Epics logger updated by Bodo (halog 119400) Some test runs taken.
    VDC gas flow reduced by Bogdan (halog 119399)
    12:30 started restoration of left arm settings
    Left Q2/3 cycled
    13:00 Left Arm is ready at 1.96 GeV/c
    13:11 Box supply trips MCC says they have to recycle magnets. No beam before 13:30
    13:45 another box supply trip! Same supply RSEP9A. MCC has called EOC for assistance.
    Added p and dpp to energy spread strip chart (see halog 119411)
    14:48 we see our 1st beam since 09:00. But it comes back fast!
    FFB is on energy spread looks OK. Beam position is OK.
    14:53 run 2799 started (Production Running on Be)
    15:50 Bodo starts turning on ep detectors for energy measurement
    Trouble with start run in coda
    RICH trip at same time