• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 00:04:52 on April 28, 2004

    Entry number 119623

    keyword=Beam Time Accounting
    
    	
    Hall A

    04/27/04 1600-2400
    Experiment #: E94-107
    Shift Leader: Vincent Sulkosky
    Shift Workers: Hachemi Benaoum, Paul Baturin, Joerg Reinhold

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0.920.820.900.470.720.930.870.906.53
    Beam Available
    but Not in Use
    0.030.180.030.480.100.020.070.030.95
    Beam Not Available
    or Unacceptable
    0.050.000.050.030.180.050.070.070.50
    Accelerator Con-
    figuration Change
    0.000.000.000.000.000.000.000.000.00
    Experiment
    Ready
    1.000.820.970.520.901.001.001.007.20
    Planned Config-
    uration Change
    0.000.000.000.000.000.000.000.000.00
    Unplanned
    Experiment Down
    0.000.180.030.480.100.000.000.000.80
    Hall not
    ready reasons
    Target0.000.000.000.000.000.000.000.000.00
    Data Acq0.000.000.000.000.000.000.000.000.00
    Other0.000.030.000.000.000.000.000.000.03
    HRSL0.000.150.030.480.100.000.000.000.77
    HRSR0.000.000.000.000.000.000.000.000.00
    HALL_OFF0.000.000.000.000.000.000.000.000.00

    Comments: Alarm Handler was closed causing us not to see a RICH HV trip and Left VDC trip. Lost time due to this. 19:31-20:04 Multiple RICH Trips (3 in an hour, 2 a minute apart) Lowered HV to 2075 V from 2100 V

    Data Entry by: V. Sulkosky