Shift summary : owl shift 01 May 2004
Shift leader: Salvatore Frullani
Shift worker: Pavlo Baturin
No special problems mentioned.
Workplan: continue production on Be with 120 microA
3002 : 23:59 - 00:23 1 M
3003 00:23 - 00:41 0.8 M ended: Coda crashed due to a mistake
3004 00:48 - 01:10 1 M
3005 )1:11 - 01:32 1 M
3006 01:33 - 01:59 1 M
3007 01:59 - 02:23 1 M
3008 02:23 - 02:46 .99 M RICH trip
3009 02:51 - 03:13 1 M
3010 03:13 - 03:15 .04 M beam stopped
at 3:15 MCC called: problem in the flow of beam dump water circuit -
No signal of such event in our screens. An alarm is needed also on our system.
called Scot Spiegel : he will come
3:50 controlled access
4:15 end controlled access beam resumed at 120 microA
3011 04:27 - 04:52 1 M
3012 04:53 - 05:15 1 M
3013 05:15 - 05:40 1 M RICH tripped after the end of the run - HV off and on twice
3014 05:54 - 06:17 1 M
3015 06:18 - 06:41 1 M
3016 06:41 - 07:04 1 M
3017 07:05 - 07:28 1 M
3018 07:28 - 07:51 1 M
3019 07:52 we leave the run going on
A part the problem with the water circuit of the beam dump the shift has been very smooth.