    keyword=Swing shift summary

    Shift crew: E.Chudakov, A.Shahinyan, B.Craver
    Running on "Be thick" target (due to the target GUI mark)
    17:24-17:30 RICH HV tripped
    19:05-19:19 MCC stopped the beam in order to correct the orbit
    20:03-20:09 RICH HV tripped
    21:15-21:30 Beam current 20-80uA, trips
    21:30 - RICH produces a spike at 15hits/cluster. Bodo came
    and suggested to take a new pedestal run. A GASIPLEX chip
    became noisy.
    21:57-22:03 - Beam off. RICH pedestal run
    22:19 - reboot ROC12 and ROC16
    22:20 - the new RICH pedestals are used. The RICH noise disappeared.
    22:20 - In order to reduce the trips MCC reduced the beam to 98uA
    22:40 - MCC increased the current to 107uA. Above that the beam trips.
    23:22-23:25 - RICH HV tripped

    Run Table



    run from to #events comments
    3195 15:48-16:13 1M
    3196 16:14:16:39 1M
    3197 16:40-17:03 1M
    3198 17:04-17:25 0.986M RICH tripped at the very end of this run (about 2min)
    3199 17:31-17:55 1M
    3200 17:56-18:18 1M
    3201 18:18-18:43 1M
    3202 18:44-19:11 0.87M
    3203 19:20-19:43 1M
    3204 19:44-20:04 0.836M - RICH tripped at the very end (1min)
    3205 20:10-20:33 1M
    3206 20:34-20:57 1M
    3207 20:58-21:24 0.84M
    3208 21:30-21:55 1M
    3209 21:58-22:03 5k RICH pedestal run (no beam)
    3210 22:09-22:10 50k RICH test
    3212 22:18-22:45 1M
    3213 22:49-23:10 1M
    3214 23:11-23:22 0.3M RICH tripped, the run stopped
    3215 23:25-23:47 1M
    3216 23:52-


    Summary


    About 17M events taken. No big problem occured.