    Log entry time 00:01:14 on May14,2004

    Entry number 121661

    keyword=swing shift summary

    16:00 shift start with the Hall in beam permit;
    16:10 100 uA to the Hall, wait for energy spread to stablize;
    16:30 start production run;
    17:45 between run 3517 and 3518: RICH HV trip, reset power supply;
    20:30 MCC called: problem with IOC, beam will be down for a while;
    21:03 MCC called: problem not easy to solve;
    23:50 MCC called: ready to restore beam, start with low current.
    23:54 beam back


    run summary:

    run#   start   stop  &bnsp #event      comment

    3515   15:21   16:13   5.6K   cosmic

    3516   16:34   17:06   1M     normal production run
    3517   17:07   17:42   1M
    3518   17:49   18:20   1M
    3519   18:22   18:55   1M
    3520   18:56   19:24   1M
    3521   19:26   19:55   1M
    3522   19:56   20:24   142K   ended early due to beam downtime
    3523   23:57

    Note about the beam time between 16:10 and 16:30:

    When the beam came back, the energy spread was around 3.0E-5 (or a
    little below). But we waited for about 20 minutes, hoping that it
    will drop to 2.5E-5. At the end of shift we reported this period
    as BNU. MCC's advice is that we should either count it as BANU, or as BNU and report immediately that the beam quality is not acceptable.