    User name C. C. Chang

    Log entry time 16:06:03 on May15,2004

    Entry number 121830

    keyword=Shift summary

    Run # Start Stop # of Events Comments
    3568 Rns #3568 - 3577 are junk.
    3578 15:05 15:35 1M First good run of this shift
    3579 15:36 In progress


    Additional comments:
    08:45 Called MCC to check the status of beam and was told that
    they are still checking the problem of beam leakage to
    Hall B. There is no estimate of how long it will take.
    09:15 MCC called to send us small beam.
    10:00 Called MCC to find out the beam status and was told that
    the beam leakage problem might be due to RF separator. They
    were still investigating the problem and may need to call
    ein xpert.
    10:15 MCC called and said that they had a new RF problem. It might
    take a while to fix it.
    10:53 MCC called to send us small (about 1 uA) tuned beam.
    11:00 MCC called to let us know that they may have found the
    beam leakage problem. They will give us CW beam in about
    10 minutes.
    11:10 MCC will send small CW beam to the hall.
    11:25 Beam is back and we have roughly 88 uA.
    12:00 During run #3568 we noticed that the Coda rate was very
    low (near zero). It turned out all ROCs are not working.
    Tried to reboot ROC12 and ROC14, but failed.
    14:00 Made an access to the hall and reset Switch 192 that
    established all ROCs connections (see HALOG 121811).
    All ROCs are now rebooted and working, so is Coda. As
    soon as beam is back, We will resume dagta taking.
    14:25 Actually, we are not ready since the Trigger Supervisor
    is not working; so we are not taking data as yet.
    14:30 MCC called they have RF cavity problem and may have to call
    in the experts.
    14:42 MCC will try to send beam to us.
    15:00 Trigger supervisor is now working and we are finally taking
    good data!.
    15:55 Beam will be off for about 5 minute