    00:00 shift started while taking production data on Be run 3594.
    Ibeam = 88 uA - energy spread ~2e-5 from SLI

    05:30 DAQ problems due to ROC 12 and ROC 16.
    Run 3602 ended normally. Not able to start new run.
    Rebooted ROCS 16 and 12 - kcoda.
    Run 3603 and 3604 JUNK

    05:40 back to normal run 3605 - 10 min lost

    06:00 RUN 3605 stopped as scheduled to give beam to Hall C leakage
    studies

    Great beam this OWL shift

    ***************************************
    HYPERNUCLEAR PRODUCTION IS OVER !!!
    ***************************************

    06:00 Asked to go to CONTROLLED ACCESS to prepare the Hall for
    Left arm polarity switch.

    06:10 Started to ramp down BOTH septa currents
    Started to ramp down LEFT HRS - SET momentum to 0

    07:15 Technical crew is down into the Hall in CONTROLLED ACCESS to
    start the polarity change of the Left HRS

    RUN SUMMARY Be Production :

    23:56 3594 1M
    00:30 3595 1M
    01:10 3596 1M
    01:47 3597 1M
    02:23 3598 1M
    03:03 3599 1M
    03:41 3600 1M
    04:17 3601 1M
    04:55 3602 1M

    3603 JUNK ROC12 and ROC 16 rebooted
    3604 JUNK kcoda

    05:40 3605 585K RUN STOPPED AS SCHEDULED AT 6:00 TO GIVE BEAM
    TO HALL C STUDIES

    ------------- END OF BERILLIUM DATA !!!