• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name X. Zheng

    Log entry time 17:16:57 on May30,2004

    Entry number 123999

    This entry is a followup to: 123876

    keyword=About the RQ2 trip yesterday

    Just to answer the question about the Right Q2 trip during May 29 day
    shift:

    After the helium level came back to 65%, we reset the power supply for
    Q2 and then set the current to 1400A, waited for 3 minutes, then set
    the momentum to the desired value. To set the momentum, we first type
    in 1.83001, then 1.83000 after about 20 seconds.

    Hope this will clarify the confusion.