    User name Z. Meziani

    Log entry time 00:04:06 on May31,2004

    Entry number 124053

    keyword=Shift summary

    Day shift May 30th, 2004

    Shift start with run # 1510 in progress
    This corresponds to Kinematics # 7

    P_left_spec = 1.9 GeV/c P_right_spec= 1.7
    I_left_septum = 175.90 A I_right_septum = 157.39 A

    16:36 production run # 1510 1M events
    16:37 restart CODA, run # 1511 bad
    16:39 production run # 1512 1 M events
    17:01 production run # 1513 1 M events
    17:22 production run # 1514 1 M events
    17:45 production run # 1515 1 M events
    18:07 production run # 1516 600 K events

    18:50 Beam gone. MCC inform us that the
    expert was called and that it will take 30 minutes.
    20:00 Beam back for 15 minutes only
    20:26 Beam back at 15 uA.

    20:28 production run # 1517 1 M events
    20:51 production run # 1518 1 M events
    21:14 Giving MCC control to make adjustements and
    bring back the beam in 15 minutes
    21:34 production run # 1519 1 M events
    21:55 production run # 1520 1 M events
    22:17 production run # 1521 1 M events
    22:39 production run # 1522 1 M events
    23:01 production run # 1523 1 M events
    23:24 production run # 1524 1 M events
    23:48 production run # 1525

    End of Swing shift