User name Z. Meziani
Log entry time 00:04:06 on May31,2004
Entry number 124053
keyword=Shift summary
Day shift May 30th, 2004
Shift start with run # 1510 in progress
This corresponds to Kinematics # 7
P_left_spec = 1.9 GeV/c P_right_spec= 1.7
I_left_septum = 175.90 A I_right_septum = 157.39 A
16:36 production run # 1510 1M events
16:37 restart CODA, run # 1511 bad
16:39 production run # 1512 1 M events
17:01 production run # 1513 1 M events
17:22 production run # 1514 1 M events
17:45 production run # 1515 1 M events
18:07 production run # 1516 600 K events
18:50 Beam gone. MCC inform us that the
expert was called and that it will take 30 minutes.
20:00 Beam back for 15 minutes only
20:26 Beam back at 15 uA.
20:28 production run # 1517 1 M events
20:51 production run # 1518 1 M events
21:14 Giving MCC control to make adjustements and
bring back the beam in 15 minutes
21:34 production run # 1519 1 M events
21:55 production run # 1520 1 M events
22:17 production run # 1521 1 M events
22:39 production run # 1522 1 M events
23:01 production run # 1523 1 M events
23:24 production run # 1524 1 M events
23:48 production run # 1525
End of Swing shift