    User name R. Feuerbach

    Log entry time 08:15:02 on June 1,2004

    Entry number 124309

    keyword=Shift summary

    Plan: take data at Kin13 (in between and has overlap with Kin7 and 10)

    0:20 Ed is back up, after fixing the diffuser water flow problem, Going to beam permit.

    0:30 beam is back

    1:08 MCC calls and reports that IOCCH2 has crashed taking the south linac RF down. They have called in an expert, and they believe it will be a while to resolve the problem.

    1:58 Beam back.

    6:36 Q2 on R-HRS faulted, probably due to a sudden drop in the liquid He levels (see Halog 124299)

    7:02 Q2 is cycled and we are ready to go. And immediately the beam goes away.

    7:06 beam back, DAQ down (ROC 12 and 16 had to be reset).


    Runs:
    1585 0:31-0:53 1M
    1586 0:54-1:09 614k Stopped with RF problems
    1587 1:59-2:19 1M
    1588 2:19-2:39 1M
    1589 2:40-3:00 1M
    1590 3:01-3:23 1M
    1591 3:24-3:45 1M L-HRS HV hicup at 3:44
    1592 3:45-4:05 1M
    1593 4:06-4:26 1M
    1594 4:26-4:46 1M
    1595 4:46-5:06 1M
    1596 5:08-5:27 1M
    1597 5:28-5:47 1M
    1598 5:48-6:07 1M beam off at the end
    1599 6:12-6:35 1M
    1600 3:45-4:05 R-HRS Q2 faulted at end
    1602 7:14-7:34 1M
    1603 7:34-7:53 1M
    1604 7:54-