    User name LeRose

    Log entry time 16:04:40 on June 1,2004

    Entry number 124333

    keyword=Shift Summary

    Production running Kin 13
    P left = 1.89 GeV/c
    P right = 1.85 GeV/c
    E beam = 5.009 GeV (set energy 5.006 GeV)

    1604 ended 0814 1M kin 13
    1605 0814-0836 1.0M kin 13
    1606 0837-0857 1.0M kin 13
    1607 0857-0901 0.1M kin 13 stopped because Accelerator takes beam for beam studies

    12:15 looks like an ESR crash - all magnets (but septa) have tripped
    In fact the problem was Hall C filling the HMS
    13:00 problems bringing magnets back up - Ed went into hall to reset power supplies

    At shift's end techs are in the Hall working on magnet power supplies.
    Don't forget to cycle the quads (at least right Q2 definitely needs it)