User name LeRose
Log entry time 16:04:40 on June 1,2004
Entry number 124333
keyword=Shift Summary
Production running Kin 13
P left = 1.89 GeV/c
P right = 1.85 GeV/c
E beam = 5.009 GeV (set energy 5.006 GeV)
1604 ended 0814 1M kin 13
1605 0814-0836 1.0M kin 13
1606 0837-0857 1.0M kin 13
1607 0857-0901 0.1M kin 13 stopped because Accelerator takes beam for beam studies
12:15 looks like an ESR crash - all magnets (but septa) have tripped
In fact the problem was Hall C filling the HMS
13:00 problems bringing magnets back up - Ed went into hall to reset power supplies
At shift's end techs are in the Hall working on magnet power supplies.
Don't forget to cycle the quads (at least right Q2 definitely needs it)