Log entry time 08:01:36 on June 2,2004
Entry number 124407
keyword=Owl Shift Summary
June 2 Shift Summary
Right Dipole is down so normal Pentaquark running is not possible. Default running condition is now through the Compton. Energy and position feedback are off for the beam.
0:00 HAPPEX running tests beam studies.
0:45 Right Q2 tripped due to liquid level.
1:30 HAPPEX tests over, switching left HRS to 0.55 GeV and 28.0 A on the left septum.
1:47 Start changing target parameters.
1:50 Finished cycling Q2 and Q3 on the left HRS.
1:55 Moving to 4cm H2 target.
2:00 Finished switching the left HRS settings.
2:04 Finished changing the target to 4cm H2 target
2:07 Request 3 uA of beam. (T3 = 3khz, vdcs<4uA)
2;15 Request 10 uA of beam. (Deadtime = 60%)
2:25 Request 3 uA of beam.
2:30 Start 2 hours of ABU with 3uA and only left HRS on 4cm H2.
Run 1617 2:28-2:52 1M
Run 1618 2:55-3:17 1M
3:20 Switching to 10 cm C optics target.
Run 1620 3:28-4:02 0.77M
3:47 Changed the onlana cuts file for one arm running
4:02 Asked to go to 6 uA
Run 1621 4:03-4:35 0.78M
4:37 Changing to the 15cm H target
4:37 Changing the left HRS momentum to 3Gev.
4:46 Cycled Q2 and Q3
5:45 Finished ramping up left HRS and Septum magnets
5:45 Asked for 3 uA of beam.
5:58 MCC is having problems getting the beam through the Compton with enough angle to correct for the septum stearing
6:05 MCC called they lost four zones in the South LINAC.
7:20 Talked with MCC and requested an access.
8:00 Shift over waiting for Techs