Main INDEX
Monthly INDEX
PREV
NEXT
User name Saha
Log entry time 16:02:18 on June 2,2004
Entry number 124418
keyword=Shift Summary
Shift Summary
0800: Hall in Controlled access. Techs in hall to fix right dipole.
1500: Beam back. Septum magnets and Left HRS Dipole ramping up.
1515: Left Dipole ramping down slowly. Tech called in.
1530: Everything OK. Left Septum still ramping up.
1600: Everything set to go The next shift is ready to take data.