• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name R. Michaels

    Log entry time 17:52:06 on June 7,2004

    Entry number 124845

    keyword=status

    The status: The detector and trigger work is completed, although
    as I write this the HAPPEX detector on L-arm is a pulser and on
    the R-arm it is off (either HV is off or something was unplugged).
    However, it was checked at one point.

    The R-arm dipole is a problem. It must be ramped up VERY slowly.
    At the moment, E. Folts, J. Gomez, and J. LeRose are working on
    it. Ed and Javier will probably go home soon and LeRose will
    continue to nurse it to health.

    We will probably go to controlled access in 1-2 hours. And
    might get beam overnight to start optics.