Main INDEX
Monthly INDEX
PREV
NEXT
User name R. Michaels
Log entry time 17:52:06 on June 7,2004
Entry number 124845
keyword=status
The status: The detector and trigger work is completed, although
as I write this the HAPPEX detector on L-arm is a pulser and on
the R-arm it is off (either HV is off or something was unplugged).
However, it was checked at one point.
The R-arm dipole is a problem. It must be ramped up VERY slowly.
At the moment, E. Folts, J. Gomez, and J. LeRose are working on
it. Ed and Javier will probably go home soon and LeRose will
continue to nurse it to health.
We will probably go to controlled access in 1-2 hours. And
might get beam overnight to start optics.