User name lkaufman
Log entry time 08:13:36 on June10,2004
Entry number 125225
keyword=Owl Shift Summary
Owl Shift Summary
Started the shift trying to get beam properly through the Compton chicane.
There were a few problems while trying to deliver current to the hall. Accelerator had separator problems a couple of times as well as ep-ion trips in the A-line.
Around 2:05 am, accelerator again began working on beam tune for Compton.
Sirish was in working on the Compton background studies for the first half of the shift (until 4:00).
At 4 am we started taking data.
Run 1992: Dithering Run
Run 1993: BPM calibration
Run 1994: PITA scan
Run 1995: Check charge asymmetry
Run 1996: IA scan
Run 1997: RHWP scan
Run 1998 and 1999 were supposed to be runs to test charge feedback, but the beam dropped out before feedback could actually run.
6:00 - Accelerator had problems with IOCs causing the RF to trip in 4 zones. Also at this time, we asked for a survey of the hall so that we could go into controlled access.
7:30 - Dave Meekins went into the hall for target cooldown.