• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Moffit

    Log entry time 19:30:22 on June10,2004

    Entry number 125265

    keyword=Ramp Delay change. Sync check

    It appears that the timing board in the Right Spectrometer has it's LSB stuck... and is creating a Ramp Delay of 2.5us.  This would explain my previous halog entry (125257).
    
    To test this... I changed the ramp delay to 1 for the Counting House, Injector and Left Spectrometer timing boards... and kept the ramp delay of 0 in the Right Spectrometer timing board for run number 2011.  The plot below shows that everything is back in sync.
    
    Hopefully, during an access, I can verify this on a scope.  I can then just replace the Right Arm timing board with another (which I have verified to be OK).
    
    


    FIGURE 1