Main INDEX
Monthly INDEX
PREV
NEXT
User name Z. Meziani
Log entry time 19:32:45 on June11,2004
Entry number 125387
keyword=Target vent and restore
19:00 Target started to vent after the loop 1 pressure went to 242 psiA. I reacted reasonably quickly to stop the venting by
opening and closing the vent solenoid valve.
the pressure dropped to 115psiA and stabilized.
Jian Ping was paged and with the help of D. Meekins the
target was filled back and pressure set to 190 psiA with the consent of the Spokespeople. This was done to give us a good margin in case of CHL fluctuations.