Main INDEX
Monthly INDEX
PREV
NEXT
User name D. Lhuillier
Log entry time 16:34:15 on June12,2004
Entry number 125458
keyword=Day shift summary
Started with "production" run at 30uA.
Then we ramped up the beam current by steps of 2uA. The right septum tripped at 35uA. The temperature of the upper coil was 7.80K just before the trip.
We continued studies on the left septum. Changing the raster size didn't affect the coil temperature.
Then Jay took ~2h of beam to finish his test plan for beam tune.
End of the shift was dedicated to further studies of septum heating. Goal is to see the sensitivity of the septum heating to beam position on target. This test is still going on at the end of the shift.