    Started with "production" run at 30uA.
    Then we ramped up the beam current by steps of 2uA. The right septum tripped at 35uA. The temperature of the upper coil was 7.80K just before the trip.
    We continued studies on the left septum. Changing the raster size didn't affect the coil temperature.
    Then Jay took ~2h of beam to finish his test plan for beam tune.