User name Z. Meziani
Log entry time 00:17:50 on June13,2004
Entry number 125501
keyword=Shift summary
16:00 Swing shift start
Septa heating tests underway
- Took measurements of temperatures
when beam was at (0,0), (-4,0), (0,0), (0,+4)
The results are summarized in log # 125469
18:10 Beam off to take care of target software freeze.
19:05 Beam back and target software issues resolved
20:00 Finished with septa heating studies.
20:20 Started new studies Raster and Current scan
Target He
current(uA) 8 15 22 30
raster size (mm) 1x1 3x3 4x4
22:30 switched to Target 12C
raster on 3x3 current 30 uA
raster off and current 10, 30, 100
23:10 finished the study.
23:30 Start new study of septa heating with
a comparison of single foil C12 and Optics 12 cm
(double foil) target.
with a current of 70 uA the difference in Septa heating
was 0.05 K. Not significant!
We did not have the chance to try the dummy 20 cm.
We wanted to know whether for the same thickness
in radialtion length as the He target and
in a double foil configuration we get the same
heating of the septa magnets.
23:53 Q1 tripped. Requested access to the hall for reset.
24:00 End of swing shift.