• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Piotr Decowski

    Log entry time 08:00:51 on June13,2004

    Entry number 125557

    keyword=Owl Shift Summary

    1. Moved in 4He target, raster 2x2
    2. Production run 2069, I = 28uA
    3. Kent tests dithering
    4. Back to production runs, raster set to 4x4, run 2071, 1:34am
    5. Lisa starts source scans to choose best parameters for feedback
       (raster set again to 2x2)
    6. Lost network connection by target control, after PC and IOC reset
       everything comes back to normal.
    7. Raster back to 4x4, production runs start (run 2081). Beam drops
       to zero - problems with injector. While waiting for the beam
       pedestal runs are taken. 
    8. At 5:55am we noticed that the right septum tripped at 4:37am (no
       alarm?). Septum recovered at 6:30am.
    9. At 7:20am Q1 tripped. Recovered at 7:55am
    10. Still waiting for beam (a part in injector is being exchanged)