• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name lkaufman

    Log entry time 07:52:15 on June14,2004

    Entry number 125676

    keyword=Power on in ISB

    The power was only off for about 20 min in the ISB (see elog 1218335), so I'm sure the PC is ok as far as humidity issues go.  I don't know if alignment is ok (because of laser power off), but I'm hopeful.  The laser is already up and running (see elog 1218364).