• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen

    Log entry time 10:50:22 on June14,2004

    Entry number 125686

    keyword=HARPS all working, HVs are in ch. 0 and 3.

    Bob (our RC) asked me to check out the HARPS (3AB, 7AB and 18AB).
    With instruction from Arun Saha and checked with Jack Segal,
    I turned on the HVs (note: they are ch. 0 and ch. 3 in the HV  beamline ep and arc). Also ran all 6 HARPs. All are working fine.