    User name aniol

    Log entry time 23:59:34 on June14,2004

    Entry number 125779

    keyword=shift summary

    15:55 prod run 2127 started
    16:51 end run 2127, 100k trig
    16:55 dithering run 2128 started
    17:07 end run 2128, 20k trig
    17:15 prod run 2129 started
    18:10 end run 2129, 100k trig
    18:11 prod run 2130 started
    18:20 beam trip off
    18:53 MCC will send 5uA to reestablish the beam
    18:53 end run 2130 - most of the time the beam was off
    18:54 prod run 2131 started at 28.3 uA
    19:56 end r2131, septa had tripped off about 19:15
    20:00 attempt tp restart septa - no luck
        We called Heidi and she walked us through a reboot for the septa. This did not work - see separate entry - She is coming in.
    20:50 Heidi and Brian go downstairs to reload the PLC software for the septa.
    21:15 Q1 left tripped off - We went down to reset the ps.
    21:30 septa control restored by Heidi
    21:52 septa are ramping up SLOWLY
    22:25 right septum is at 278.25A, left is at 242A and still rising. We decide to take data using the RHRS until the left septum gets to full current.
    22:30 start run 2132, production, LHRS is junk
    23:05 end run 2132, 67K good trig for RHRS
    23:18 tried dithering on r2133 and r2134 but the pan analysis gui is not responding correctly
    23:24 end dithering run 2134 - restarted pan and saw dithering is ok
    23:32 Lisa starts the PITA scans