    User name S. Kowalski

    Log entry time 15:55:59 on June17,2004

    Entry number 126088

    keyword=Day Shift Summary

    Continuing Run 2116 production.
    Run end at 8:29
    Beam off; asked for controlled access to work on left septum
    8:40 Beam off, pedestal run Run=2217
    Moved to empty target position, and "parked" the He cell
    (reduced CHL flow rate to 7.5 gm/s, to allow cryogen overhead
    for Hall C target cooldown).
    Run 2217 finished.  
    Run 2218 started at 9:27.  Beam off, pedestal run.
    10:10 Left Septum is now fixed. Valve improperly set.
    10:23 Run 2218 finished.
    10:23 ramping up left septum
    10:23 Run 2219 started, pedestal run. 
    11:18 Run finished
    11:19 Run 2220 started, pedestal run.
    11:30  Left septum hung up at 195 A.  Called Tech.
    11:52 Shut off right septum.  Required to affect fix in left septum which refuses to reach max current.
    12:13  Septa both ramping up again.
    12:15 Run 2220 finished.
    12:16 Run 2221 started, pedestal run.
    12:41 Right septum up to set current.  Left has a ways to go yet.
    13:10 Run 2221 finished.
    13:10 Run 2222 started, pedestal run.
    13:14 Left septum up to maximum current.
    14:08 Run 2222 finished
    14:09 Run 2223 started, pedestal run.
    15:00 Q3 quenched
    15:00 Run 2223 ended.
    15:20 Q3 fault reset.