User name Seonho Choi
Log entry time 15:24:41 on June18,2004
Entry number 126197
keyword=Target operating condition
Jian-Ping gave us instructions on target operating condition. When Hall C target cooldown is complete, we want to have
1. CHL flow somewhere around 15 g/s, but no more than 15 g/s
2. PID loop temperature at 7.00
3. Fan speed 48 (20%)
4. HP heater around 250
This condition should be OK for 30uA beam current. When adjusting JT valve to control CHL flow, make sure to follow the procedure in the Guide (basically no more than 1% change per minute).
After you get the stable operating condition, adjust limits for the alarm so that you won't have any false alarms.