NEXT
User name jpchen
Log entry time 16:02:51 on June21,2004
Entry number 126533
keyword=shift summary
Day shift summary:
8:00 Right Septum was ready and taking production data. Left septum ramped ~270 A, then dropped by itself. When the day shift took control, it was close to 200A. We changed the set point to 200A, the
drop stopped. We then set to 230A, it started ramping up again. When it reached 230 A, we set it to the operating temperature 278.57 A.
It's ramping up.
8:45 Left Septum reached 278.75A
9:27 MCC took bema away for beam study. We moved into Empty target position and started pedestal run.
9:30 Beam study started.
11:50 MCC called that problem with SL, may take two hours.
14:40 beam back. moved to BeO to check beam spot.
14:52 Helium target in, starting high current test.
16:00 test still going on.
Run 2325-2326 only right arm, left Septum was ramping.
run 2325, started at 7:29, ended at 8:25, 100K, Right Septim ok, left was ramping
2326, 8:26-8:46, 36K, right arm ok, left septum was ramping.
Left Septum ready now.
2327, 8:46-9:27, 72K. both arms ok.
2328-2334 Pedestal runs.
2333 is over-sampling run.
raster 3.5x3.5mm, fan speed 48 Hz:
run 2335, 4.5 uA,
2336, 9.3 uA.
2337, 18.8 uA.
2338 18.8 uA
2339 junk
2340 junk