Run 2380: all 4 movers (dispersive and transvers axes in Left and Right Arms) moved over their whole ranges in 10 steps. Waiting time at each step 60s. Run 2384: same but now in 100 steps (to see fine potentiometer nonlinearities). Waiting time 30s. HV voltage in both arms -1550V (measurment of the datk current)