User name bogdanw
Log entry time 00:06:58 on June26,2004
Entry number 126888
keyword=shift summary
controll access to fix the BCM power supply
and the septa temp. readout calibration
16:45 asked for beam
17:02 start production 30 mkA
temp. on BCM temp controller
time 1 2 3 4 5 6
18:30 - 77.2 76.1 89.9 90.2 70.5
19:15 - 78.1 77.4 93.7 94.1 70.1
20:00 - 79.7 79.3 97.1 97.4 70.3
22:30 - 86.4 86.2 102.6 103.4 70.4
septa heating data, time constant is 600 sec.
30.0 mkA -> 7.50 RT1R
35.0 mkA -> 7.75
32.5 mkA -> 7.60
beam position variation with 5 mkA
run# BPMA X BPMA Y run BLUMI7
need positins A - B < 0.3 mm
2405 0 0 good 4800
2406 1-2 0 adjustment higher at wrong angle
2407 2 stable 0.05 good run, FB OFF
2408 -(1-2) 0 adjustment
2409 -1.7 0 good run, FB OFF
2410 0 0 good run, FB ON
2411 0 +1 adjustment
2412 0.2 +2 good run, FB ON
2413 0 -1 adjustment, FB ON
2414 0 -2 good run, FB ON
22:30 back to 34.5 mkA for production
2415 0 0 gain adjustment, production