Main INDEX
Monthly INDEX
PREV
NEXT
User name Kowalski
Log entry time 15:59:00 on June27,2004
Entry number 127112
keyword=Shift Summary16:00
8:00 Continuing Run 2467.
8:40 Stopped 2467. Started 2468.
10:36 End Run 2469.
10:38 Beam off for spot move.
10:38 Move to dummy Al target. Stopped Compton run.
10:50 Changed half-wave plate to 'IN' Used new 'flipper' routine.
11:07 Beam available.
11:08 Beam on at 30 micro-A on Al. Test for septa heating with collimators in septa.
11:21 beam Off. Move target back to hydrogen.
11:26 Beam on. Hydrogen. 34 micro-A.
Septum Temperatures:
H: 32 micro-A Beam Off Al: 30 micro-A
Left: Up 6.9 K 6.1 K 6.35 K
Lo 7.1 6.25 6.50
Right: Up 7.7 6.6 6.95
Lo 7.5 6.3 6.65
11:27 Start Run 2471. 34 micro-A.
15:00 Beam polarization, latest run was 85.9 +-0.7% S/N = 24.2.
16:00 Almost a perfect shift!!!: 7.52 hrs production running.