• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Kowalski

    Log entry time 15:59:00 on June27,2004

    Entry number 127112

    keyword=Shift Summary16:00

    8:00 Continuing Run 2467.
    8:40 Stopped 2467.  Started 2468.
    10:36 End Run 2469. 
    10:38 Beam off for spot move.
    10:38 Move to dummy Al target.  Stopped Compton run.
    10:50 Changed half-wave plate to 'IN'  Used new 'flipper' routine.
    11:07 Beam available.
    11:08 Beam on at 30 micro-A on Al. Test for septa heating with collimators in septa.
    11:21 beam Off.  Move target back to hydrogen.
    11:26 Beam on.  Hydrogen.  34 micro-A.
    
     Septum Temperatures:
    
             H: 32 micro-A        Beam Off      Al: 30 micro-A
    
    Left:  Up    6.9 K              6.1 K          6.35 K
           Lo    7.1                6.25           6.50
    
    Right: Up    7.7                6.6            6.95
           Lo    7.5                6.3            6.65
    
    11:27 Start Run 2471. 34 micro-A.
    15:00  Beam polarization, latest run was 85.9 +-0.7%  S/N = 24.2.
    16:00 Almost a perfect shift!!!: 7.52 hrs production running.