• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Higinbotham

    Log entry time 16:13:59 on June28,2004

    Entry number 127248

    keyword=Shift Summary

    08:04 Start shift finishing run 2493
    08:05 Insertable Halfwaveplate Retracted
    08:07 Started Run 2494 
    08:20 Ended run in order to test when the Septum trip.
    
    08:22 Start Run 2495 while waiting for Septum test
    
    (see log entries about the test)
    
    During test we tooks runs:
    
    09:03 2496 (during this run right arm tripped)
    09:29 2497 (during this run left arm tripped)
    09:48 2498 (boiling study)
    
    10:00 Stop for Beam Studies
    
    10:25 2500 Pedstal Run
    11:32 2501 Pedstal Run
    
    14:15 Close Hall and Get Ready for beam
    14:30 Problem with Accelerator at the Injector
    16:00 Still No Beam