Hall A Experiment #: E99-115
06/29/04 1600-2400
Shift Leader: Ryan Snyder
Shift Workers: Stan Kowalski, Jason Cahoon
1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0.92 | 0.57 | 0.70 | 0.43 | 0.00 | 0.38 | 0.73 | 0.69 | 4.42 |
Beam Available but Not in Use | 0.05 | 0.10 | 0.07 | 0.43 | 0.95 | 0.57 | 0.20 | 0.09 | 2.46 |
Beam Not Available or Unacceptable | 0.03 | 0.34 | 0.23 | 0.15 | 0.05 | 0.05 | 0.07 | 0.22 | 1.13 |
Accelerator Con- figuration Change | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Experiment Ready | 0.95 | 0.90 | 0.93 | 0.57 | 0.00 | 0.43 | 0.80 | 0.90 | 5.48 |
Planned Config- uration Change | 0.05 | 0.10 | 0.07 | 0.00 | 0.00 | 0.00 | 0.00 | 0.10 | 0.32 |
Unplanned Experiment Down | 0.00 | 0.00 | 0.00 | 0.43 | 1.00 | 0.57 | 0.20 | 0.00 | 2.20 |
Hall not ready reasons | |||||||||
Target | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Data Acq | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Other | 0.00 | 0.00 | 0.00 | 0.43 | 1.00 | 0.57 | 0.20 | 0.00 | 2.20 |
HRSL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSR | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HALL_OFF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Comments: Septum magnet needed new PLC controls around 19:00 21:00 Magnets needed time to ramp up to setpoints after PLC replaced 22:15 Rt. septum tripped. Ran with Left arm only
Data Entry by: Ryan Snyder