    keyword=Dithering-Slope Test Plan
    test plan

     Dithering-slope Test Plan: Thursday, July 1, 2004

    Updated: July 1, 17:15pm by Rob Feuerbach, Run Coordinator (pager 584-5411)


    Purpose: 

    We want to measure the correlation between the (momentum, position, angle, beam energy) and response of the HAPPEX detectors, especially since the different segments might have different slopes. This test will move the elastic stripe on the detectors by roughly 2.4cm in X and Y independently.

    Program

    1. Start with the standard production configuration.
    2. Inform Halls A and C that we will be modulating the beam energy 50% of the time.
    3. For each momentum/current setting in the table below (please do in order), do:
      1. Double Check the settings are correct and the Start-of-Run record is updated.
      2. Take a profile scan (less than 1min tripped off).
      3. Turn dithering ON (high freq. mode)
      4. Take a 10minute HAPPEX run: less than 1min tripped off.
      5. Dithering OFF.
    4. Return to normal production settings.
    Left HRSRight HRS
    Run(s)SettingP0 (GeV/c)ISeptum(A) P0 (GeV/c)ISeptum(A)
    (+0.2%, 0%)2.9769275.252.9659274.25
    (+0.0%,-1%)2.9710272.502.9600271.50
    (+0.0%,+1%)2.9710278.002.9600276.00
    (-0.2%, 0%)2.9651275.252.9541274.25

    Note: Septum settings

    The current given above is the Readback value (seen on the Hall A Tools page); the Set-points may be slightly different.

    For each run

    General Tasks:

    Please log below (and in the HALOG) any unusual observations and problems solved
    Date/Time Name Comment HALOG